FAQs
More FAQs- How often do I clean my floors?
- Isn’t it hard to fix an area that is damaged on an acrylic floor? What if I drag a large piece of furniture across it and leave a scratch?
- How long will it take to have my floors coated with acrylic?
Urethane requires only damp mopping on a daily basis or the use of an auto scrubber with a white pad, red pad or a soft brush. Never dry buff or dry scrub your floor; a loss of gloss may occur.
Acrylic finishes that are scratched can often be spray buffed or burnished so that the scratch is either less noticeable or repaired altogether. In many cases, applying a thin coat over the scratch is helpful. Call ServiceMaster Clean of Saskatoon professionals for an on-site consultation.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.